The Challenge
Without an efficient partial discharge monitoring system for their gas-insulated switchgear (GIS), the industrial customer faced the following challenges:
-
Unplanned outages
Gradual insulation degradation initiated sudden faults, leading to unexpected failures.
-
Reduced reliability
Due to unexpected failures, the availability of the asset suffered, reducing the quality of their industrial output.
-
Operational downtime
With the asset becoming offline due to failures or repairs, the industry faced major operational issues.
-
Increased maintenance costs
Fixing damaged insulation or replacing components became costly and time-consuming.